Act4Water - Building a water positive future

Infiltration pond recharge in Molins de Rei

This project expands the system of infiltration ponds that CUADLL already operates in Molins de Rei, on the banks of the Llobregat River. The new ponds allow more water to be infiltrated into the ground, where it percolates naturally until it reaches the aquifer, helping to recover part of the groundwater resource the territory depends on. Water reaches the ponds through planned releases and by making use of river floods. This strengthens water availability and the resilience of a coastal aquifer under pressure.

Positive impact

Certificación ACT4WATER_Water Plus

CAPs

Water Credits, also known as Credits Aqua Positive (CAPs), are the unit of measurement in the Act4Water Standard for the positive impact a project has on freshwater resources and the environment.

Total CAPs generados

One CAP equals 1,000 m³ of water footprint saved, under the Water Footprint Network’s water footprint methodology.

A CAPeq, or CAP equivalent, is calculated by applying the ISO 14046 water footprint methodology, which adjusts the value of CAPs to account for water stress in the region.

Project lifespan and funding

Project developer
Corporate project partner
Corporate project partner

Explora otros proyectos

954 CAPs disponibles

Desalinización Móvil en San Eustaquio