Shashemene constructed wetland

This constructed wetland is a compact, nature-based solution designed to treat wastewater for 134 residents over 272 m². Using local plants and filtration media, the system processes over 3,912.8 m³ of water annually, addressing sanitation issues caused by overflowing septic tanks and significantly improving the local environment.
Ethiopia Wetland - sanitation

Positive impact

% CAPs compensated 0%

CAPs (Credits Aqua Positive), also known as water credits, are a unit that measures the positive impact of projects on water resources.

1 CAP = 1,000 m³ of water footprint saved

CAP eq, or CAP equivalents, are calculated using the ISO 14046 methodology, which adjusts the value of CAPs by considering water stress in the region.

Explore our projects

CAPs sold out

Viladesuso Treatment Wetland

CAPs sold out

Restoration of the Doñana wetlands

CAPs sold out

Invasive species eradication in Barranco del Poyo

CAPs sold out

Floodplain restoration in Belvis del Jarama